Track permits per building with a 31-item document checklist — see at a glance which documents are done and which are missing.
You went to file the permit and three documents were missing — back you go, two days lost. With the checklist you confirm you are 100% ready before you leave the office. Never get turned away for a missing document again.
Each trip back for a missing document costs 1–2 working days plus travel, and the average application sees 2–3 of them. With the checklist: zero. The permit process is about two weeks shorter on average.
Download for free and try it on site. No internet connection needed.