Daily material consumption — which material, where, how much — with wastage tracking per unit and reports filtered by site and block.
100 tonnes of cement delivered, 85 tonnes used — where are the other 15? Wastage, theft or a miscount? Usage records account for every kilo, so you can measure wastage and keep costs under control.
Average wastage in construction runs at 8–15%. On an untracked site, 12% of the materials budget simply disappears. Usage tracking brings wastage below 5%.