Material Usage
Daily material consumption — which material, where, how much — with wastage tracking per unit and reports filtered by site and block.
What you can do with Material Usage
- Material type (cement, rebar, sand, paint, etc.)
- Unit and quantity (tonnes, kg, pcs, litres)
- Where it was used (block, floor, unit)
- Date of use
- Wastage quantity
- Comparison with materials received
- Filter by site and block
- Periodic usage report
What it does for you on site
Why it matters
100 tonnes of cement delivered, 85 tonnes used — where are the other 15? Wastage, theft or a miscount? Usage records account for every kilo, so you can measure wastage and keep costs under control.
Time and money
Every job has some wastage; what matters is knowing how much. Comparing usage with what came in shows where the gap is, so you can act during the job instead of finding out at the end.